The red Fire Safe plugs from PSI Sealing are comparable in operation to the standard EPDM plugs, but are made from a special, fire-retardant rubber. Fire retardant rubber. This makes the Fire Safe plug from PSI Sealing not only watertight and gas-tight, but also fire-retardant. The fire-retardant effect of the Fire Safe plug has been extensively tested and is certified by Lloyd's Register.
Sealing Plug DIN 54,5/25-26, Fire safe pressure tight
Stock: 0Indicative delivery time: 4-6WSealing Plug DIN 54,5/26-27, Fire safe pressure tight
Stock: 0Indicative delivery time: 4-6WSealing Plug DIN 54,5/28-29, Fire safe pressure tight
Stock: 0Indicative delivery time: 4-6WSealing Plug DIN 54,5/30-31, Fire safe pressure tight
Stock: 0Indicative delivery time: 4-6WSealing Plug DIN 54,5/32-33, Fire safe pressure tight
Stock: 0Indicative delivery time: 4-6WSealing Plug DIN 54,5/33-34, Fire safe pressure tight
Stock: 0Indicative delivery time: 4-6WSealing Plug DIN 54,5/34-35, Fire safe pressure tight
Stock: 0Indicative delivery time: 4-6WSealing Plug DH-AP 60/20-21, Fire safe pressure tight
Stock: 0Indicative delivery time: 4-6WSealing Plug DH-AP 60/22-23, Fire safe pressure tight
Stock: 0Indicative delivery time: 4-6WSealing Plug DH-AP 60/25-26, Fire safe pressure tight
Stock: 0Indicative delivery time: 4-6WSealing Plug DH-AP 60/27-28, Fire safe pressure tight
Stock: 0Indicative delivery time: 4-6W
The Fire Safe plug has been tested for a fire delay of 60 minutes. In addition, a specific A60 fire resistance test was also conducted. The A-60 requirement, which occurs inter alia on board ships and offshore platforms, means that the temperature on the non-fire side of the wall in question must not have increased by more than 180 ° C after 60 minutes. This requirement is intended to prevent certain materials on the non-fire side from igniting due to the increased temperature.
The Fire Safe plug from PSI Sealing, also shortened to FS, is suitable as a fire retardant lead-through plug for steel pipes through A-0, A-15, A-30 and A-60 steel walls and floors. For this purpose, the respective wall must be provided on both sides with A-60 classified insulation material, which at least covers the space 200 mm around the bushing. In addition, a pipe length of 300m must be symmetrically welded into the wall, where the pipe to be fed first and then, at both ends, a Fire Safe plug is placed. The pipe diameter of the pipe to be routed may be a maximum of 168 mm.